FIRST DELTABEAM PROJECT WITH LOCAL MANUFACTURING

Esco Distribution proceed with the extension of its factory with Deltabeams in Montmagny Qc, Canada. The height under the floor and the fire resistance were both important factors for the choice of the structure. The beams were manufactured at Acier Fortin located a few blocks from the work site. 

Project information: 

  • BEAM TYPES: D30-400 DELTABEAM (12" THICK)
  • MAXIMUM HEIGHT OF FLOOR: 14 ½"  (368mm)
  • HOLLOWCORE HEIGHT: 12" (300mm)
  • FIRE RESISTANCE: TWO HOURS 

Important contributors:

  • ENGINEER OF RECORD: ASP
  • STEEL FABRICATOR: ACIER FORTIN 
  • HOLLOWCORE PRODUCER: SCHOKBETON INC. 
  • CONTRACTOR : CONSTRUCTION GINOVE  

Pictures:  

Poutre Delta 04 
The Deltabeams were manufactured in the factory located in the back of this picture.  The manufacture of the beams was well done by Acier Fortin under supervision of Peikko and in respect of the worksite schedule. 


Poutre Delta 03  


Poutre Delta 01 
Columns and beams were erected by Construction Ginove. The erection was done rapidly and with standard steel erection equipements. 

Poutre Delta 05 
Beam connections are made with two ASTM A325 bolts and with vertical support that facilitate its positionning.

 

Poutre Delta Montmagny 06 
Hollowcores positionned by Schokbeton.

 



 Poutre Delta Montmagny 07
Before casting the topping, the joints of the slabs and and Deltabeams must be grouted.

Poutre Delta Montmagny 08 
 On the worksite Deltabeams offer a great opportunity to start working on the next stages of the building because of minimum shoring under the floors.