City Electrical Factors (CEF) IT and Marketing Office, Durham, UK

  • Building type:
  • Office Buildings
Fullscreen map Close Street View

For the new CEF Date, IT and Marketing Centre the architects Faulkner Brown wanted a “technologically cutting-edge building”

A kit of parts approach was taken and 90nr DELTABEAM®s were incorporated into the design along with Peikko Column Shoes & Anchor bolts. DELTABEAM® Composite Beams providing a slim floor and flat soffit also interfaced with precast floor units which incorporated combined heating & cooling system, creating a Thermally Active Building System (TABS). The frame was delivered the 11-week contractual period.

The new CEF headquarters also secured the 2019 RIBA Northeast Building of the Year Award.

Read more down-arrow.png

Project facts

Project size:
2100 m2
Project floors:
2
Developer:
CEF Ltd
Construction company:
PCE Ltd
Structural Engineer:
Curtins
Architect:
FaulknerBrowns
Delivery year:
2016
Completion year:
2017