Current site: Peikko United States. Do you want to change country or language?
Peikko DELTABEAM® composite beams resting on and hanging from the columns in project Malinas retail park in Mechelen.
The beams have an integrated fire resistance of Rf60 and Rf120 with welded on down stands attached to level the floor. A total of 140 meters of DELTABEAM® was supplied.
Peikko's invisible PCs® console system eliminates the need for big concrete corbels to support the beams.