Multipurpose Commercial Building for AS Elevators, Steinach, Switzerland

  • Building type:
  • Industrial Buildings
  • Office Buildings
Fullscreen map Close

13 months construction time with composite structure from Peikko.

A new multipurpose commercial building was erected in Steinach for the elevator manufacturer AS Elevators.

The building complex consists of a main building with a production/warehouse hall as well as a head building with office space and a smaller commercial hall, which is intended for rental.

The complete planning was done with BIM-3D and included complex connections in the area of the crane runway due to limited room height. The connections were worked out together with Peikko.

Thanks to Peikko's DELTABEAM® Frame composite frame system, spans of up to 13 meters could be achieved and the construction time was only 13 months.

Read more down-arrow.png

Project facts

Developer:
METHABAU
Construction company:
METHABAU
Structural Engineer:
METHABAU
Architect:
METHABAU
Delivery year:
2018
Completion year:
2018