Current site: Peikko United States. Do you want to change country or language?

Shanghai Chengtou S7 Highway Project, Shanghai , China

  • Building type:
  • Infrastructure
Fullscreen map Close

Shanghai city for highway investment (group) co., LTD., the first department of the second battalion commander to check YiQiang mentioned: "S7 highway as a committee of Shanghai prefabricated pilot project, not only in the structure of Bridges and roads on the comprehensive application of prestressed assembly technology, at the same time, we have constructed a PC of toll station management USES a room the exploration research, the introduction of Finland Peikko node of new type high strength bolts are assembled, replaced the traditional grouting sleeve and grouting bellows components connection way.

This is the first time the connection technology has been used in prefabricated buildings in China."The successful application of this technology enables the assembly of 500 square meters of management rooms to be completed within 12 days by only 8 operators, greatly increasing the work efficiency and greatly improving the working environment.

Project facts

Project size:
500 m2
Developer:
上海城投公路投资(集团)有限公司, Shanghai Chengtou Highway Investment (Group) Co. LTD
Construction company:
上海建工集团股份有限公司, Shanghai Construction Engineering Group Co. LTD
Structural Engineer:
上海市政工程设计研究总院(集团)有限公司, Shanghai Municipal Engineering Design and Research Institute (Group) Co., LTD
Delivery year:
2019

Solutions we provided

Contact us